Did you venture out last week to see the large Snowy 2.0 truck movement? A 12 metre section of the cutterhead for the fourth Snowy 2.0 tunnel boring machine (TBM) passed through the region.
It was an impressive sight as the large centre block of the cutterhead was transported over four night from Port Kembla to Marica site near Kiandra.
The Postman joined other locals on Sharp Street, Cooma, to wa...